Near you

How much of the UK’s electricity do data centres use?

Great Britain onlyfirst official count

Short answerAbout 2% in Great Britain, by the first official count.

About 2% of the electricity consumed from Great Britain’s grid in 2024: 4.5 TWh out of 249.2 TWh. That’s the UK energy department’s first count. It matched electricity meters to 242 data centres. It isn’t the whole UK picture. It leaves out Northern Ireland. It also leaves out data centres that an organisation runs only for its own use. Other figures are higher. Parliament’s library says around 2.5% for the UK. The grid operator, NESO, had put Great Britain at 7.6 TWh in 2023, working from the size of data centres and how hard it assumed they run. The meters showed 4.1 TWh for that year, a little over half as much. Use is very local: 77% of it was in London and the South East. In Slough, a town next to London, data centres took 65% of all the electricity consumed from the grid. Use grew 41% from 2020 to 2024. NESO’s forecast was just over 20 TWh by 2030, about 4.4 times the 2024 count. In 2026 it lowered its outlook for data centres, because they use less of their capacity than it had assumed.

The bigger pictureWorldwide, data centres used about 1.5% of electricity in 2024 (IEA). Next door in Ireland, they used 23% of metered electricity in 2025.

Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh. 1 TWh = 1 billion kWh.

Data-centre electricity consumption in Great Britain: counts, an older estimate and a forecast
  • 3.2 TWh 2020, from meters: Energy department (DESNZ)
  • 4.1 TWh 2023, from meters: Energy department (DESNZ)
  • 4.5 TWh 2024, from meters: 2% of grid consumption
  • 7.6 TWh 2023, NESO’s estimate: Worked out from data-centre capacity
  • 20 TWh 2030, NESO’s forecast: “just over 20 TWh”; since lowered

Unit: TWh a year.

Why the claim misleads

The queue is far bigger than what is likely to be built. Requests to connect data centres now add up to more than 70 GW. NESO expects about 5.2 GW to be connected by 2030, and says the queue holds projects that are unlikely to go ahead.

What nobody knows yet
  • There is no measured figure for the whole UK. The official count covers Great Britain, and the government says data centres are not yet separately identified in its main energy statistics.
  • Nobody has counted the electricity used by data centres that organisations run only for themselves. The official count leaves them out.
  • The count is new, and the government labels it as still in development. 17 of the 259 data centres on its list could not be matched to a meter.
  • The page where Parliament’s library gives its 2.5% does not say how the figure was worked out.
  • NESO lowered its outlook in 2026, but Hum hasn’t found its new figure for 2030 in a form it could read.
  • Nobody publishes how much of this electricity goes to AI.
Sources (16)

Hum’s sums

  • Just over 20 TWh in 2030 (NESO’s forecast) ÷ 4.5 TWh in 2024 (the government’s meter count) ≈ 4.4 times as much. Rough: the two were worked out in different ways
  • 4.1 TWh (from meters) ÷ 7.6 TWh (from capacity), both for Great Britain in 2023 ≈ 54%, a little over half
Cite this

UK Department for Energy Security and Net Zero (DESNZ), Data centre electricity consumption in Great Britain, 2020 to 2024 (30 June 2026; Official Statistics in Development; consumption from the grid), as quoted in Hum, “How much of the UK’s electricity do data centres use?”, https://humearth.org/q/uk (quote checked 14 Nov 2026).

Cite the original source first; Hum is where you found it.

What do Wh, kWh and TWh mean?

Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh, and 1 TWh = 1 billion kWh. Hum compares each number with something everyday so you don’t need the units.

Send this answer

Data centres used about 2% of the electricity consumed from Great Britain’s grid in 2024, by the UK government’s first count from meters. In Slough, next to London, it was 65%.

Next questions