How much of Ireland’s electricity do data centres use?

counted from meters

Short answerAbout 23% in 2025, up from 5% in 2015.

About 23% of the Republic of Ireland’s metered electricity consumption in 2025, by the country’s Central Statistics Office (CSO). That’s 7,663 GWh, or about 7.7 TWh. In 2015 it was 5%. This is a count, not an estimate: the CSO went through around 2.6 million electricity meters to find the ones that feed data centres. A small number of data centres use most of it. Their use has grown every single year since 2015, and is now about 6 times what it was. In 2025 it rose 10%, while everyone else’s rose 2%. Data centres now use more than all the homes in towns and cities (18%), and not far off all homes together (28%). The grid operator, EirGrid, expects data centres and other new technology sites to make up 32% of all electricity demand by 2030. Almost all the extra demand already signed up is around Dublin. Since December 2025 the energy regulator’s rules say a new data centre must bring its own power plant or batteries, on site or nearby, as big as the grid connection it asks for. It must also match at least 80% of its yearly use with new renewable power made in Ireland.

The bigger pictureWorldwide, data centres used about 1.5% of electricity in 2024 (IEA). Ireland’s share is about 15 times that.

Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh. 1 TWh = 1 billion kWh.

Data centres’ share of Ireland’s metered electricity consumption (CSO), and EirGrid’s forecast
  • 5 % 2015: 1,240 GWh, metered
  • 11 % 2020: 3,030 GWh, metered
  • 21 % 2023: 6,339 GWh, metered
  • 22 % 2024: 6,973 GWh, metered
  • 23 % 2025: 7,663 GWh, metered
  • 32 % 2030, forecast: EirGrid: data centres plus other new technology sites, share of all demand

Unit: %.

Why the claim misleads

Ireland is a small country with a lot of data centres. Dublin is one of the cities where most of Europe’s data centres are concentrated (IEA). The regulator says Ireland has been very successful in attracting them, taking their share of national electricity demand from 5% in 2015 to 22% in 2024.

What nobody knows yet
  • The CSO only counts electricity that comes through a meter on the mains network. Hum hasn’t found an official count of electricity that data centres make for themselves on site.
  • There is no agreed definition of a data centre. The CSO picks out the meters itself, and says the figures for all years can be revised.
  • Nobody publishes how much of this electricity goes to AI.
  • The 2030 figure is a forecast. It also counts other new technology sites, and it is a share of all electricity demand, not of metered consumption, so it doesn’t line up exactly with the CSO’s 23%.
Sources (17)

Hum’s sums

  • 7,663 GWh ÷ 1,000 ≈ 7.7 TWh (Ireland’s data centres, metered consumption, 2025)
  • 7,663 GWh in 2025 ÷ 1,240 GWh in 2015 ≈ 6.2, so about 6 times as much
  • 23% in Ireland (2025) ÷ 1.5% worldwide (2024) ≈ 15.3, so about 15 times the world share. Rough: the years differ, and Ireland’s figure is a share of metered consumption
Cite this

Central Statistics Office (Ireland), Data Centres Metered Electricity Consumption 2025 (7 July 2026; metered consumption), as quoted in Hum, “How much of Ireland’s electricity do data centres use?”, https://humearth.org/q/ireland (quote checked 14 Nov 2026).

Cite the original source first; Hum is where you found it.

What do Wh, kWh and TWh mean?

Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh, and 1 TWh = 1 billion kWh. Hum compares each number with something everyday so you don’t need the units.

Send this answer

Data centres used 23% of Ireland’s metered electricity in 2025, up from 5% in 2015 (Central Statistics Office). That’s more than all the homes in the country’s towns and cities.

Next questions