Near you

How much electricity do data centres use in the UAE and the Gulf?

Short answerAbout 3 TWh in the UAE in 2025, around 2% of its electricity (one firm’s estimate).

About 3 TWh in 2025, by Wood Mackenzie, a research firm. That was approximately 2% of the UAE’s 173 TWh of electricity demand. It expects over 6 TWh by 2030, at least 2 times as much. Hum could not find a figure from the UAE government or its power companies. In Saudi Arabia, the research centre KAPSARC puts data centres at around 2.8 TWh in 2024, or 0.85% of the country’s electricity. It says that could reach between 10.2 and 42.2 TWh by 2030. The estimates don’t agree. The International Energy Agency (IEA) puts the whole Middle East at 1.7 TWh in 2025, less than the estimate for either country alone. What is planned is far bigger than what exists. The IEA counts 0.4 GW of data-centre capacity in the Middle East in 2025, and a pipeline of projects of almost 10 GW. In Abu Dhabi, G42 and OpenAI have announced Stargate UAE, a 1 GW cluster inside a campus planned for 5 GW. The first 200 MW is expected in 2026. These are announcements, not measurements. Capacity (MW or GW) is the most power a site can draw at once, not the energy it uses in a year (TWh). Hum’s rough ceiling: 1 GW running flat out all year would use 8.76 TWh, about 2.9 times what all the UAE’s data centres used in 2025. The full 5 GW would use 43.8 TWh, about 25% of the UAE’s electricity demand in 2025. Real use would be lower. G42 says the campus will be powered by nuclear, solar and natural gas. Abu Dhabi is also building a 1 GW gas power plant that will supply data centres. Today 68% of the UAE’s electricity comes from fossil fuels and 32% from low-carbon sources, by Ember, an energy research group.

The bigger pictureData centres worldwide used about 485 TWh of electricity in 2025 (IEA). The UAE’s 3 TWh is roughly 0.62% of that. The two figures come from different sources.

Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh. 1 TWh = 1 billion kWh.

Estimates of data-centre electricity use in the Gulf (consumption). They come from different sources and don’t agree
  • 1.7 TWh Whole Middle East, 2025: IEA estimate
  • 2.8 TWh Saudi Arabia, 2024: KAPSARC estimate, 0.85% of Saudi electricity
  • 3 TWh UAE, 2025: Wood Mackenzie estimate, approximately 2% of UAE demand
  • 6 TWh UAE, 2030, forecast: Wood Mackenzie says over 6 TWh

Unit: TWh a year.

Why the claim misleads

The UAE and Saudi Arabia want to become hubs for AI, and they have the money and the energy to try. US companies such as OpenAI and Oracle are building there with local partners such as G42.

What nobody knows yet
  • Hum could not find an official figure from the UAE government or its power and water companies for how much electricity data centres use. The 3 TWh is one research firm’s estimate.
  • The estimates don’t fit together. Added up, the UAE and Saudi estimates are about 3.4 times the IEA’s figure for the whole Middle East. They may count different things.
  • Nobody knows how much of the announced capacity will be built, or how hard it will run. The IEA says the delay or cancellation of a single project could change the outlook for the region.
  • Hum found no figures for Qatar, Kuwait, Bahrain or Oman.
Sources (16)

Hum’s sums

  • 6 TWh in 2030 ÷ 3 TWh in 2025 = 2 times as much (Wood Mackenzie says “over 6 TWh”, so at least 2 times)
  • A ceiling, not an estimate: 1 GW × 24 hours × 365 days ÷ 1,000 = 8.76 TWh a year, if a 1 GW site ran flat out all year
  • 8.76 TWh ÷ 3 TWh ≈ 2.9 times what all the UAE’s data centres used in 2025 (Wood Mackenzie’s estimate)
  • 5 GW × 24 hours × 365 days ÷ 1,000 = 43.8 TWh a year, if a 5 GW campus ran flat out all year
  • 43.8 TWh ÷ 173 TWh ≈ 25% of the UAE’s electricity demand in 2025
  • 3 TWh in the UAE ÷ 485 TWh in the world ≈ 0.62% of the world’s data-centre electricity in 2025. Rough: the two figures come from different sources
  • 3 TWh (UAE, 2025, Wood Mackenzie) + 2.8 TWh (Saudi Arabia, 2024, KAPSARC) = 5.8 TWh. 5.8 ÷ 1.7 TWh (IEA, whole Middle East, 2025) ≈ 3.4 times. Rough: the years and methods differ
Cite this

Wood Mackenzie (research firm), news release (26 March 2026; yearly consumption), as quoted in Hum, “How much electricity do data centres use in the UAE and the Gulf?”, https://humearth.org/q/uae (quote checked 15 Nov 2026).

Cite the original source first; Hum is where you found it.

What do Wh, kWh and TWh mean?

Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh, and 1 TWh = 1 billion kWh. Hum compares each number with something everyday so you don’t need the units.

Send this answer

The UAE’s data centres used about 3 TWh of electricity in 2025, around 2% of the country’s demand (Wood Mackenzie estimate). Planned AI campuses could use several times that.

Next questions