How much electricity does one big AI data centre use, compared with homes?
Short answerUp to millions of homes: about 4 million for Meta’s planned 5 GW campus.
It depends a lot on size. The IEA says a typical AI-focused data centre uses as much electricity as 100,000 households, and the largest ones being built will use 20 times as much: about 2,000,000 households. Companies give the size of a campus as power (how fast it can draw electricity), not as energy used in a year. An average US home bought 10,791 kWh in 2022, which is about 1.23 kW, all the time (Hum’s sum). Crusoe’s AI campus in Abilene, Texas is planned at 1.2 GW: at full power, that’s about 974,000 US homes. Meta says its Richland Parish campus in Louisiana will deliver 5 GW of compute capacity: about 4 million US homes, or about 3 million Louisiana homes, which use more. These are what the campuses would consume, not generate. They are the companies’ own plans, and real use is lower because sites don’t run flat out all the time.
The bigger pictureAll the world’s data centres consumed about 485 TWh of electricity in 2025 (IEA). Meta’s 5 GW campus, run flat out for a year, would use about 44 TWh: about 9% of that, from one site.
Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh. 1 TWh = 1 billion kWh.
Each row is one published figure. A hollow dot is a company’s own number.
- 100,000 homes Typical AI data centre (IEA): IEA: as much as 100,000 households
- 162,358 homes Crusoe Abilene, first phase (200 MW): Hum’s sum with the EIA’s average US home (company figure)
- 974,145 homes Crusoe Abilene, planned (1.2 GW): Hum’s sum with the EIA’s average US home (company figure)
- 2,000,000 homes Largest being built (IEA): IEA: 20 times a typical one
- 4,058,940 homes Meta Richland Parish, planned (5 GW): Hum’s sum with the EIA’s average US home (company figure)
Unit: homes.
What nobody knows yet
- Companies publish capacity, the most power a campus can draw. None of them publishes how much electricity these campuses actually use in a year.
- Meta says “compute capacity”. Its page doesn’t say whether the 5 GW includes cooling and the rest of the site.
- The IEA’s summary doesn’t say which country’s households it means, so its 100,000 isn’t quite the same as Hum’s US homes.
- Crusoe expected Abilene’s second phase to be finished in mid-2026. Hum hasn’t checked that it is.
Sources (7)
- IEA, Energy and AI (2025), executive summary Estimated
“A typical AI-focused data centre consumes as much electricity as 100 000 households, but the largest ones under construction today will consume 20 times as much.”
Quote checked on the page, 8 Nov 2026 - Crusoe, press release on its Abilene, Texas AI campus (18 March 2025) Company says so
“The second phase of construction, expected to be completed in mid-2026, includes six additional buildings, bringing the total facility to eight buildings, approximately 4 million square feet, and a total power capacity of 1.2 gigawatts (GW).”
Quote checked on the page, 8 Nov 2026 - Crusoe, press release on its Abilene, Texas AI campus (18 March 2025) Company says so
“The initial phase, comprising two buildings at 980,000 square feet and 200+ megawatts, is expected to be energized in the first half of 2025.”
Quote checked on the page, 8 Nov 2026 - Meta, Richland Parish (Louisiana) data center page Company says so
“This data center will play a vital role in accelerating our AI progress, delivering 5 gigawatts of compute capacity to house Hyperion, our largest multi-gigawatt AI cluster.”
Quote checked on the page, 8 Nov 2026 - US Energy Information Administration (EIA), FAQ: How much electricity does an American home use? Measured
“In 2022, the average annual amount of electricity sold to (purchased by) a U.S. residential electric-utility customer was 10,791 kilowatthours (kWh), an average of about 899 kWh per month.”
Quote checked on the page, 8 Nov 2026 - US Energy Information Administration (EIA), FAQ: How much electricity does an American home use? Measured
“Louisiana had the highest annual electricity purchases per residential customer at 14,774 kWh”
Quote checked on the page, 8 Nov 2026 - IEA, Key Questions on Energy and AI (2026) Estimated
“electricity consumption from data centres roughly doubling from 485 TWh in 2025 to 950 TWh in 2030”
Quote checked on the page, 3 Oct 2026
Hum’s sums
- An average US home buys 10,791 kWh a year. Spread over 365 days × 24 hours, that’s about 1.23 kW, all the time
- IEA: a typical AI data centre uses as much as 100,000 households. The largest being built, 20 times that: 100,000 × 20 = 2,000,000 households
- Crusoe’s first phase, 200 MW = 200,000 kW, drawn 24 hours a day for 365 days ÷ 10,791 kWh a home ≈ 162,000 US homes, at full power
- Abilene, 1.2 GW = 1,200,000 kW, drawn 24 hours a day for 365 days ÷ 10,791 kWh a home ≈ 974,000 US homes, at full power
- Meta’s 5 GW = 5,000,000 kW, drawn 24 hours a day for 365 days ÷ 10,791 kWh a home ≈ 4 million US homes (4,060,000), at full power
- Meta’s 5 GW = 5,000,000 kW, drawn 24 hours a day for 365 days ÷ 14,774 kWh a Louisiana home ≈ 3 million Louisiana homes (2,960,000), at full power
- 5 GW × 24 hours × 365 days = 43,800 GWh ≈ 44 TWh in a year, at full power
- 44 TWh ÷ 485 TWh (all data centres, 2025) ≈ 9%
Cite this
IEA, Energy and AI (2025), executive summary, as quoted in Hum, “How much electricity does one big AI data centre use, compared with homes?”, https://humearth.org/q/big-data-centre (quote checked 8 Nov 2026).
Cite the original source first; Hum is where you found it.
What do Wh, kWh and TWh mean?
Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh, and 1 TWh = 1 billion kWh. Hum compares each number with something everyday so you don’t need the units.
Send this answer
One big AI campus can need as much electricity as millions of homes. Meta’s planned 5 GW campus in Louisiana, run flat out, matches about 4 million average US homes (Hum’s sum from EIA figures).