Near you

How much of Texas’s electricity do data centres use?

Short answerAbout a twentieth in 2023, close to the US average, and growing fast.

About a twentieth, on the latest state estimate. EPRI, a US electricity research institute, estimates that data centres used 4.59% of the electricity consumed in Texas in 2023. That is about 21.8 TWh (Hum’s arithmetic). Only Virginia’s data centres used more. But Texas industry uses so much power that the share stayed close to the US average. It is growing fast. The US Energy Information Administration (EIA) says electricity consumption is growing faster in Texas than anywhere else in the US. ERCOT, the main Texas grid, carries 90% of the state’s load. In October 2024 the EIA forecast that ERCOT’s biggest flexible users, sites that can draw 75 megawatts or more, would use 54 billion kWh in 2025. That would be about 10% of the electricity consumed on ERCOT. This group counts crypto mines as well as data centres. In July 2025 the EIA forecast that demand on ERCOT would rise 7% in 2025 and 14% in 2026, as large data centres and crypto mines switch on. Far more is waiting. By September 2026, big users asking to connect to ERCOT added up to 474 GW, about 90% of it data centres, Utility Dive reported. That is about 5.5 times ERCOT’s highest demand in 2024, which was 86 GW. A GW measures power at one moment, not energy over a year, and a request is not a building. Texas passed a law in 2025, Senate Bill 6. It covers sites asking for more than 75 megawatts. They must pay towards the cost of connecting them, and share in power cuts when supply runs short. In 2026 the governor paused new data-centre connections while ERCOT audits the requests (EIA). EPRI’s simple projections for 2030 put data centres between 5.47% and 10.64% of Texas’s electricity.

The bigger pictureAcross the whole US, data centres used about 4.7% of electricity consumption in 2024 (Berkeley Lab). Worldwide it was about 1.5% (IEA). In Virginia it was 25.59% in 2023 (EPRI).

Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh. 1 TWh = 1 billion kWh.

Share of electricity consumption used by data centres (Texas and Virginia 2023; US and world 2024)
  • 1.5 % World, 2024: IEA estimate
  • 4.59 % Texas, 2023: EPRI estimate
  • 4.7 % United States, 2024: Berkeley Lab estimate
  • 25.59 % Virginia, 2023: EPRI estimate

Unit: % of electricity.

Why the claim misleads

EPRI says Texas draws data centres because it is business-friendly and has plenty of land. Its challenges are grid reliability and how fast the grid can expand. From 2019 to 2023, electricity sales to commercial customers in Texas grew by 13 billion kWh. Only Virginia added more.

What nobody knows yet
  • Nobody meters every data centre in Texas and publishes the total. EPRI’s 4.59% is an estimate for 2023. EPRI’s 2026 update, which counts crypto mining too, says Texas is level with Virginia in total data-centre power use, but gives no new share for Texas in its text.
  • The EIA’s 10% is a forecast made in October 2024. It covers ERCOT, not all of Texas, and it counts every very large flexible user, crypto mines included. Hum has not found a published count of what data centres alone used in 2025.
  • The 474 GW is a list of requests, not of data centres that exist. The EIA said in 2024 that when or if such planned sites come online is uncertain. ERCOT’s own files block automated readers, so Hum quotes a news report for this figure.
  • The 2030 figures are simple projections, not plans. EPRI applied national growth rates to every state, and says growth is unlikely to be spread evenly.
  • Nobody publishes how much of this electricity goes to AI.
Sources (23)

Hum’s sums

  • 21,813,159 MWh ÷ 1,000,000 = about 21.8 TWh (Texas data centres, 2023)
  • 474 GW ÷ 86 GW = about 5.5 (requests to connect to ERCOT, against ERCOT’s highest demand in 2024; both are capacity, not energy)
Cite this

EPRI (Electric Power Research Institute), Powering Intelligence: Analyzing Artificial Intelligence and Data Center Energy Consumption, white paper, May 2024 (Table 2: data-centre electricity consumption in MWh and share of the state’s electricity consumption; the first two columns are 2023, the rest are four simple projections for 2030), as quoted in Hum, “How much of Texas’s electricity do data centres use?”, https://humearth.org/q/texas (quote checked 15 Nov 2026).

Cite the original source first; Hum is where you found it.

What do Wh, kWh and TWh mean?

Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh, and 1 TWh = 1 billion kWh. Hum compares each number with something everyday so you don’t need the units.

Send this answer

Data centres used about 4.59% of Texas’s electricity in 2023 (EPRI), close to the US average. Requests to connect now add up to 474 GW, about 5.5 times the Texas grid’s highest demand in 2024.

Next questions