How much of Oregon’s electricity do data centres use?

Short answerMore than a tenth in 2023. A newer estimate says almost a quarter.

More than a tenth, and maybe close to a quarter. The estimates differ a lot. EPRI, a US electricity research institute, estimates that data centres used 11.39% of the electricity consumed in Oregon in 2023. That is about 6.4 TWh (Hum’s arithmetic), the fifth most of any state. A newer study, by the consultancy ECOnorthwest and the University of Virginia, estimates 14.0 TWh in 2025. OPB, Oregon’s public broadcaster, reports that the study puts this at about 23% of Oregon’s electricity sales. That is about 2.2 times EPRI’s figure for two years earlier. Growth explains part of the gap. Different methods explain the rest: EPRI says its sources vary most for Oregon. In its 2026 update, EPRI says Virginia is the only state where data centres use over 20% of electricity today. So EPRI still puts Oregon below that. The state regulator has its own estimate, for part of the state. The Oregon Public Utility Commission (PUC) says data centres are roughly 15 percent of the load of Oregon’s investor-owned power companies. It expects 25 percent by 2030. That load grew about 36 percent a year since 2021. The Northwest Power and Conservation Council expects data-centre load across the Pacific Northwest to roughly double by 2030, mostly on public power, which the PUC does not regulate. Oregon passed a law in 2025, the POWER Act (HB 3546). It puts data centres over 20 megawatts in their own price class, with contracts of at least 10 years. After the PUC applied it to Portland General Electric, data centres’ rates rose 29 percent on average and home rates fell 1.3 percent. In July 2026 Hillsboro became the first Oregon city to pause new data-centre applications, for 120 days. Looking ahead, ECOnorthwest expects 24.8 TWh by 2030. EPRI’s 2026 update says Oregon could pass 20% by 2030 in its middle scenario. Water matters locally too. In The Dalles, Google used 434.4 million gallons (about 1.6 billion litres) of water in 2024, OPB reports from city records. That was a third of the city’s water.

The bigger pictureAcross the whole US, data centres used about 4.7% of electricity consumption in 2024 (Berkeley Lab). Worldwide it was about 1.5% (IEA). Oregon is well above both on every estimate.

Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh. 1 TWh = 1 billion kWh.

Share of electricity used by data centres: three estimates for Oregon, beside the US and the world in 2024
  • 1.5 % World, 2024: IEA estimate, share of consumption
  • 4.7 % United States, 2024: Berkeley Lab estimate, share of consumption
  • 11.39 % Oregon, 2023: EPRI estimate, share of consumption
  • 15 % Oregon’s investor-owned utilities, 2026: Oregon PUC estimate, share of their load
  • 23 % Oregon, 2025: ECOnorthwest estimate, share of electricity sales, as reported by OPB

Unit: % of electricity.

Why the claim misleads

EPRI says Oregon draws data centres with low electricity rates, low-carbon power, a mild climate, tax incentives and skilled workers. Its challenges include the pace of growth.

What nobody knows yet
  • Nobody meters every data centre in Oregon and publishes the total. The two statewide figures are estimates and they are far apart: 11.39% for 2023 (EPRI) and about 23% for 2025 (ECOnorthwest).
  • Hum could not find the full ECOnorthwest study online, so the 23% is quoted from OPB’s report. The 14.0 TWh is from the authors’ own preliminary slides of July 2026, which may differ from the final study.
  • The PUC’s 15 percent covers only investor-owned power companies. The PUC says it lacks visibility into data centres outside their territories.
  • Water use is hard to see. Oregon’s Data Center Advisory Committee heard that non-disclosure agreements can make it difficult for the public to learn how much city water one data centre uses. The Dalles figure came out through a public records request.
  • The 2030 figures are forecasts, and the forecasters use different methods.
  • Nobody publishes how much of this electricity goes to AI.
Sources (22)

Hum’s sums

  • 6,413,663 MWh ÷ 1,000,000 = about 6.4 TWh (Oregon data centres, 2023)
  • 14.0 TWh ÷ 6.4 TWh = about 2.2 (ECOnorthwest’s estimate for 2025 against EPRI’s estimate for 2023)
  • 434.4 million US gallons × 3.785 litres a gallon ≈ 1.6 billion litres
Cite this

EPRI (Electric Power Research Institute), Powering Intelligence: Analyzing Artificial Intelligence and Data Center Energy Consumption, white paper, May 2024 (Table 2: data-centre electricity consumption in MWh and share of the state’s electricity consumption; the first two columns are 2023, the rest are four simple projections for 2030), as quoted in Hum, “How much of Oregon’s electricity do data centres use?”, https://humearth.org/q/oregon (quote checked 15 Nov 2026).

Cite the original source first; Hum is where you found it.

What do Wh, kWh and TWh mean?

Wh is a watt-hour: a 1-watt light left on for an hour. 1 kWh = 1,000 Wh, and 1 TWh = 1 billion kWh. Hum compares each number with something everyday so you don’t need the units.

Send this answer

Data centres used 11.39% of Oregon’s electricity in 2023 by one estimate (EPRI), and about 23% in 2025 by another (ECOnorthwest). Nobody meters the total.